$4.40 $4.20
Item NO. | SO47 |
Size | 47(w)*47(h)mm |
Material | PVC |
Package | 4M/ PC, 12PCS/ bag,plastic bag+ cartons as per customer request |
MOQ | 3000M |
Sample lead time | 3-15days |
Delivery time | 15-30 days after sample confirmed and deposit received |
Delivery method | by sea |
Advantage | Environmental protection, elegant & functional Moisture proof, colorful & easy installation, Antisepsis, anti-aging & long life |
Application site | Various staircases ,corridors , balcony |
Feature | similar to wood |
SO47 square glass railing Basic Info.
Item NO. | SO47 |
Size | 47*47mm |
Material | PVC |
Package | 4M/ PC, 12PCS/ bag,plastic bag+ cartons as per customer request |
MOQ | 3000M |
Sample lead time | 3-15days |
Delivery time | 15-20 days after sample confirmed and deposit received |
Delivery method | by sea |
Advantage | Environmental protection, elegant & functional |
Moisture proof, colorful & easy installation, | |
Antisepsis, anti-aging & long life | |
Application site | Various staircases ,corridors , balcony |
Feature | similar to wood |
FAQ
Q:How about the MOQ ?
A:3000 meters.
Q:Are you manufacturer or trading company ?
A:We are the manufacturer of staircase, balustrade / railing, we also supply Modern indoor balustrades for more than 10 years.Before delivery, we will have a Installation Test of your purchased goods. We do that to make sure all we offer are in good condition, that is the perfect quality we want to control.
Q:What should I offer for the quote of the Modern indoor balustrades ?
A:1) Pls tell us what style or product you like.
2) Provide Some photos and plan drawings.
3) If you have any other special requirements, pls contact us.
Q:How to install the stainless steel railing ?
A:Detailed installation drawings of the stainless steel railing will be provided;
Q:What is your payment ?
A:30% as deposite,70% balance before shipment,we accept T/T,L/C,western union,paypal.
Q:What is the delivery time if I make order ?
A:Every product needs to be customized, so the normal delivery time is 30-35 days of receipt of the final payment,otherwise about 40 days.
Q:How to place order ?
A:1) Inquiry from customer for a particular product or project.
2) Offer us your project drawing or purchasing list for our checking.
3) Our team work on the building information, and work out a solution for each product and also quotation.
4) Customer check and confirm the solution and quotation, then sign the PI and arrange deposit.
5) We offer the details shop drawing for each products and customer confirm each shop drawing.
6) Arrange production.
Specialize in the manufacturing and marketing of handrails, demonstrating our exceptional proficiency in production and promotion.
©2019 - SHAOXING SHENGOU HANDRAILS FACTORY. All Right Reserved. E-mail: info@stair-railing.com T: +86-189 68221785
Reviews
There are no reviews yet.