About PVC handrails Hot Bending
See how to bend the PVC handrails during installation
- Install the rest of the PVC handrail, and then mark the place where the stairs turn to determine the position that needs to be bent
- Measure the size of the handrail where the hot bend needs to be made, and also mark the position.
- Use a electric heater to finish the bending, turn on the blanket heat, and put the PVC handrails part which need to be bended, and wait 20-30min
- Slowly bend the softened PVC handrail, taking care to operate along the shape of the stair railing
- Fix the pvc handrail and cool it with a wet towel.
- Finished